NBS Website | Register | Login
Login
NATIONAL BUREAU OF STATISTICS
An Online Microdata Catalog
  • Home
  • Microdata Catalog
  • Contact
    Home / Central Data Catalog / NGA-NBS-NFLS-2022-V01 / variable [F8]
central

Nigeria Forced Labour Survey 2022
First round

Nigeria, 2022
Get Microdata
Reference ID
NGA-NBS-NFLS-2022-v01
Producer(s)
National Bureau of Statistics (NBS)
Metadata
Documentation in PDF DDI/XML JSON
Created on
May 23, 2024
Last modified
May 23, 2024
Page views
60260
Downloads
1884
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Demographic
  • Education
  • Forced Labour
  • Housing

HOU_01.Others Specify (hou_01_others_specify)

Data file: Housing

Overview

Valid: 333
Invalid: 0
Type: Discrete
Start: 86
End: 125
Width: 40
Range: -
Format: character

Questions and instructions

Question pretext
What is the principal construction material of the exterior walls?
Literal question
HOU_01.OTHER SPECIFY
Categories
Value Category Cases
2 1
0.3%
4 ROUND HOT 1
0.3%
BAMBOO 1
0.3%
BLOCK 12
3.6%
BLOCK HOUSE BUT NOT COMPLETED 1
0.3%
BLOCK HOUSE NOT PLASTERED 1
0.3%
BLOCK NOT CEMENTED 1
0.3%
BLOCKS 1
0.3%
CANOPY 1
0.3%
CEMENT AND MUD 4
1.2%
CEMENT WITH BLOCK 2
0.6%
CEMENT WITH MUD 1
0.3%
CLAY 1
0.3%
CLAY AND CEMENT 1
0.3%
CLEMENT BLOCKS 2
0.6%
COMPLETE MUD 1
0.3%
DIRT AND MUD 6
1.8%
EARTH AND MUD 2
0.6%
GRASSES 1
0.3%
HUT 2
0.6%
HUTS 1
0.3%
LEAVES 1
0.3%
METAL (ZINC) 1
0.3%
MOOD 1
0.3%
MOOD HOUSE 1
0.3%
MOOD WITH CEMENT 2
0.6%
MUD 85
25.5%
MUD & DIRT 1
0.3%
MUD / CEMENT 1
0.3%
MUD AND CEMENT 13
3.9%
MUD AND DIRT 7
2.1%
MUD AND STRAW 25
7.5%
MUD AND STREW 15
4.5%
MUD BLOCK 2
0.6%
MUD BLOCK WITH CEMENT 1
0.3%
MUD BLOCKS 1
0.3%
MUD BUILDING 1
0.3%
MUD HOUSE 10
3%
MUD HOUSE AND UNCOMPLETED CONCRETE HOUSE 1
0.3%
MUD HOUSE AND UNCOMPLITED CONCRETE HOUSE 1
0.3%
MUD ONLY 3
0.9%
MUD PLASTERED WITH CEMENT 3
0.9%
MUD STRAW 1
0.3%
MUD WALL 10
3%
MUD WALLS 1
0.3%
MUD WHICH WAS PLASTERED WITH CEMENT. 1
0.3%
MUD WITH CEMENT 50
15%
MUD WITH CEMENT PLASTERING 1
0.3%
MUD WITH CEMENTED WALLS 1
0.3%
MUD WITH STRAW 3
0.9%
MUD WITH ZINC ROOFING 1
0.3%
MUD/CEMENT 2
0.6%
MUH AND STRAW 1
0.3%
NOTHING 1
0.3%
O HOUSE 1
0.3%
OLD NATIVE BUILDING 7
2.1%
ONLY MUD 5
1.5%
RAUND HOTAS. 1
0.3%
ROUGH 1
0.3%
SAND WALL 1
0.3%
STONES WITH MUD HOUSE 1
0.3%
TACH HOUSE 1
0.3%
THACH HOUSE 2
0.6%
THATCH HOUSE 1
0.3%
TITLES 2
0.6%
UNCOMPLETED 1
0.3%
UNCOVER ADOBE 1
0.3%
UNPLASTED BLOCK HOUSE 1
0.3%
UNPLASTED BLOCK WALL 4
1.2%
UNPLASTED BLOCKS WALL 1
0.3%
WOOD 3
0.9%
WOODEN MATERIAL 1
0.3%
ZINC BATCHER 4
1.2%
ZINC STONES WITH MUD 1
0.3%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
National Bureau of Statistics | Microdata Catalog

© National Bureau of Statistics | Microdata Catalog, All Rights Reserved.